Description
IntegraRack Concrete Slab/Footing Lag Bolt Mounting Kit For All BallastRack™ Systems (For up to 10 solar panels)
*Concrete footing must be at least 3.5″ thick (site specific engineering may be required)
The Concrete Slab/Footing Lag Bolt Mounting Kit includes (22) Concrete Tapcon Bolts with washers and two concrete drill bits. This mounting option can be installed on pre-cast concrete footings or an existing concrete surface, such as a patio (site specific engineering required).
Notice
Kit is designed to mount (11) Racking Frames or one row of ten solar panels.
Permits
- When direct bolting BallastRack frames to a concrete footing, a building permit will most likely be required by your county.
- An electrical permit will be required for the solar system.
Always check with your county for any other permits that may be required prior to installing your solar system.
Included Components
- (22) Concrete Tapcon Bolts
- (44) Washers
- (2) Concrete Drill Bits
- (1) High Quality Open-Ended Ratchet Wrench
Reviews
There are no reviews yet.